
705 Moreland ST Vidor, TX 77662
2 Beds
2 Baths
1,100 SqFt
UPDATED:
Key Details
Property Type Single Family Home
Sub Type Detached
Listing Status Active
Purchase Type For Sale
Square Footage 1,100 sqft
Price per Sqft $122
Subdivision Dewitt, Jv
MLS Listing ID 92832215
Style Contemporary/Modern
Bedrooms 2
Full Baths 2
HOA Y/N No
Year Built 1940
Annual Tax Amount $1,767
Tax Year 2024
Lot Size 0.560 Acres
Acres 0.56
Property Sub-Type Detached
Property Description
Location
State TX
County Orange
Interior
Heating Central, Electric
Cooling Central Air, Electric
Fireplace No
Exterior
Parking Features Attached Carport
Carport Spaces 2
Water Access Desc Public
Roof Type Composition
Private Pool No
Building
Lot Description Other
Story 1
Entry Level One
Foundation Pillar/Post/Pier
Sewer Public Sewer
Water Public
Architectural Style Contemporary/Modern
Level or Stories One
New Construction No
Schools
Elementary Schools Vidor Elementary School
Middle Schools Vidor Junior High School
High Schools Vidor High School
School District 1005 - Vidor
Others
Tax ID R34379

EV Radius Score
Loading EV Radius Score…
Loading EV Radius…
Loading EV Radius…
⚠️ EV Radius Disclosure
⚠️ EV Radius Score is provided for informational purposes only and reflects the density, type, and proximity of publicly listed electric-vehicle charging stations near a property. It does not represent or guarantee the safety, maintenance, or condition of any charging equipment, facility, or network.
Station data is sourced from the U.S. Department of Energy’s Alternative Fuels Data Center (AFDC) and third-party networks, which may not include current safety notices, temporary outages, or maintenance events.
Drivers should always follow manufacturer and network safety guidance, observe posted warnings at charging sites, and consult their vehicle’s owner’s manual for approved charging practices.
Buyers, agents, and consumers should independently verify all information before relying on EV Radius data.
⚡ Always confirm charger availability and compatibility using your vehicle’s or charging-network app before starting a session.






